CURRENTLY UNDER CONSTRUCTION — Brand-new Gulf-access waterfront home by Academy Home Developments! This site-specific Park Avenue design offers 4 bedrooms, 3 full baths, 2,439 sq. ft. of living area, 3,609 total sq. ft., a 3-car garage, pool and 305 sq. ft. covered lanai, with one of the three full baths conveniently serving the pool area. The centerpiece is the dramatic great room with a 13-foot coffered ceiling and spectacular 10-foot-high, 90-degree zero-corner impact-glass slider, creating a seamless transition to the lanai, pool and long canal views. Additional 10-foot impact sliders in the primary suite and rear guest bedroom continue the indoor-outdoor connection across the back of the home. The custom kitchen is loaded with upgrades, including all-wood soft-close cabinetry, stacked upper cabinets with illuminated glass displays, under-cabinet and toe-kick lighting, stainless steel appliances, double ovens, tile backsplash and a large waterfall-edge island. A hidden pantry with beverage cooler and convenient garage-to-pantry pass-through makes the space as functional as it is impressive. The primary suite offers direct access to the waterfront living area, while the spa-inspired primary bath features a soaking tub and oversized shower with multiple shower heads and rain heads. Illuminated tray ceilings, a dramatic 16'+ entry, CBS construction, Low-E impact glass, impact entry and pool-bath doors, and a metal roof add to the home's custom design and durability. Outdoor living is equally impressive with a screened heated saltwater pool, champagne spa, covered lanai, outdoor shower and full outdoor kitchen with built-in grill, refrigerator, sink and vented hood. Architectural soffit lighting and front-column accent lighting add another level of detail after sunset. Boaters will appreciate the private dock and 14,000-lb boat lift, approximately 60 feet of seawall, an 80-foot-wide canal, north rear exposure and only one bridge to open water. A rare opportunity to secure a brand-new luxury Gulf-access home while construction is underway, with estimated completion in late September to October 2026. Plans and renderings are available. Final finishes, selections, dimensions and completion timing are subject to builder confirmation and change prior to completion.
Listing courtesy of RE/MAX Trend.